Electric Vehicle Infrastructure
UK Government · United Kingdom
This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and future-ready infrastructure to enable multiple chargepoints.
Overview
This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and future-ready infrastructure to enable multiple chargepoints.
Grant details
Application Components: Online application, installer details, property and parking details, company registration/VAT details
Application Platform: OZEV Electric Vehicle Chargepoint Grants online portal
Assessment Criteria: Eligibility compliance, correct installation setup, and adherence to scheme requirements
Decision Process: Grant claimed via installer after installation; OZEV reviews and approves claim
Decision Risks: Application rejection if requirements not met; audits may result in withdrawal if non-compliant
Doctoral Studentships: Not specified
Environmental & EDI Requirements: Supports transition to low-emission transport and sustainability objectives
Funding Structure: Covers 75% of installation and infrastructure costs (up to £15,000 per grant); up to £350 per chargepoint socket; up to £500 per parking space; maximum of 5 grants across 5 sites
Governance Requirements: Compliance with subsidy control (minimal financial assistance rules) and safety regulations
important notes: Chargepoints must be for staff and fleet use only (not public); minimum of 5 parking spaces must be enabled; installer must claim the grant on behalf of the applicant; grant deducted from installation invoice
Industry Leverage Expectation: Not specified
Ineligible Applicants: Businesses exceeding SME threshold or not properly registered
Ineligible Costs: Installations that are mandatory under building regulations or planning conditions; public-use chargepoints
Intent to Apply Deadline: Not specified
Key Organisational Requirements: Must be an SME; must not exceed £315,000 in minimal financial assistance over 3 financial years; must use OZEV-approved installer and eligible chargepoint
Match Funding Requirement: Business must cover remaining installation costs beyond grant contribution
Monitoring Requirements: Possible audits by OZEV; site inspections may be required
Project Start Date: After approval and installation arrangement
Renewal Structure: Not specified (scheme closing March 2026)
Quick facts
- Status
- Closed
- Closing date
- 31 Mar 2026
- Funding amount
- Amount not specified
- Funding type
- Capital Grant
- Audience
- Business
- Industry
- Sector Agnostic