Skip to main content
Back to grants dashboard
OpenUpdated 16 Oct 2026

Electric Vehicle Chargepoint Grant for Households with On-Street Parking

UK Government, through the Office for Zero Emission Vehicles (OZEV) · United Kingdom: England, Wales, Scotland and Northern Ireland. The scheme is not available in the Channel Islands or Isle of Man.

The grant provides support towards the purchase and installation of an electric vehicle (EV) chargepoint at a residential property when a permanent cross-pavement charging solution, such as a cable channel, is also installed.

Summary

Deadline

31 Mar 2027

Updated

16 Oct 2026

The grant provides support towards the purchase and installation of an electric vehicle (EV) chargepoint at a residential property when a permanent cross-pavement charging solution, such as a cable channel, is also installed.

Eligibility

Applicant types

See eligibility requirements

Industries

Not applicable, as this is an individual/household grant.

Match funding

Not specified

Eligible applicants

Individuals who own or rent and live in a domestic residential property and do not have private and exclusive access to off-street parking. Applicants must have access to suitable on-street parking and own, lease, be assigned, or be the primary user of an eligible electric vehicle, or have ordered one.

Funding and scope

Benefit amount

75% of the cost of purchasing and installing the chargepoint, up to £500 per socket. The maximum grant increased from £350 to £500 from 1 April 2026. Each eligible household can apply for one socket. If the application was made before 1 April 2026, the maximum remains £350. (Find a Grant)

Total fund available

Not specified

Funding intensity

75% of the cost of purchasing and installing the chargepoint, up to £500 per socket. The maximum grant increased from £350 to £500 from 1 April 2026. Each eligible household can apply for one socket. If the application was made before 1 April 2026, the maximum remains £350. (Find a Grant)

Payment type

Not specified

Eligible expenses

Not specified

Ineligible costs

  • Chargepoint installations completed before OZEV confirms eligibility; installations that are mandatory under law or planning/building requirements; duplicate claims; installations without the required permanent cross-pavement charging solution; and replacement or relocation of an existing chargepoint.

Application and risks

Application platform

GOV.UK Find & Apply for a Grant. Applicants use the "Start new application" button on the official grant page. (Find a Grant)

Competitiveness

Not scored

Decision timeline

The applicant first obtains any necessary permissions and contacts an OZEV-approved installer for a quote. The applicant submits the grant application and must wait for OZEV confirmation of eligibility before installation. After the chargepoint and cross-pavement solution are installed, the installer claims the grant on the applicant's behalf. OZEV pays the approved grant directly to the installer. (Find a Grant)

Assessment process

The applicant first obtains any necessary permissions and contacts an OZEV-approved installer for a quote. The applicant submits the grant application and must wait for OZEV confirmation of eligibility before installation. After the chargepoint and cross-pavement solution are installed, the installer claims the grant on the applicant's behalf. OZEV pays the approved grant directly to the installer. (Find a Grant)

Application sections

Not specified

Application components

  • Application details; evidence of local highways authority consent for the cross-pavement solution; declaration that required planning permissions will be obtained; property details; eligible vehicle details; and installer information. Applicants may also need third-party permissions, such as permission from a landlord, freeholder or managing agent.

Timeline and partners

Opening date

18 Mar 2024

Project duration

Not specified

Project start

Not specified

Project end

Not specified

Additional guidance

Document research last revised 2026-08-18.

Key Organisational Requirements

The applicant must live at the residential property, not have private and exclusive off-street parking, install an eligible chargepoint together with a permanent cross-pavement charging solution, obtain consent from the local highways authority for the cross-pavement solution, obtain any required planning permission, and use an OZEV-approved installer and eligible chargepoint.

Property Requirements

The property must be domestic and the applicant must own or rent and live there. The property must have access to lawful, generally available on-street parking outside or near the home.

Vehicle Requirements

The applicant must own, lease, be assigned, or be the primary user of an eligible vehicle, or have ordered an eligible electric vehicle. The vehicle must be on the OZEV-approved electric vehicle list.

Installer Requirements

The installation must be completed by an OZEV-approved installer, and the chargepoint must be an eligible residential chargepoint model.

Monitoring Requirements

OZEV may audit selected installations. Audits can involve checking grant data, statements and records and may include an on-site inspection. Applicants and installers must provide requested information and allow access for inspections. Failure to cooperate may result in payment being withheld or reclaimed. (Find a Grant)

Objectives

To accelerate the uptake of EV chargepoints for people with accessible on-street parking.

Important Notes

The grant cannot be backdated and the chargepoint must not be installed before OZEV confirms eligibility. The cross-pavement solution must be permanent and cannot simply be a temporary cable cover or mat. The applicant must obtain local highways authority consent before installation and may also need planning and third-party permissions. The grant does not provide ownership of, exclusive use of, or reserved access to an on-street parking space and therefore does not guarantee that the applicant will always be able to park next to the chargepoint. The installer deducts the grant from the invoice before claiming it from OZEV. Funding is confirmed until 31 March 2027. (Find a Grant)

Application deadline in source document

31 March 2027, 11:00pm

Official source

Read the funding authority guidance

Quick facts

Status
Open
Deadline
31 Mar 2027
Funding amount
75% of the cost of purchasing and installing the chargepoint, up to £500 per socket. The maximum grant increased from £350 to £500 from 1 April 2026. Each eligible household can apply for one socket. If the application was made before 1 April 2026, the maximum remains £350. (Find a Grant)
Funding band
Not specified
Funding type
Capital grant
Payment type
Not specified
Audience
See eligibility requirements
Industry
Not applicable, as this is an individual/household grant.
Last updated
16 Oct 2026
Published
Not specified