Skip to main content
Back to grants dashboard
ClosedUpdated 16 Oct 2026

Electric Vehicle Infrastructure Grant for Staff and Fleets

UK Government, Office for Zero Emission Vehicles (OZEV) · United Kingdom

This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and supporting infrastructure needed to enable multiple chargepoints. (Find a Grant)

Summary

Deadline

31 Mar 2026

Updated

16 Oct 2026

This grant supports small and medium-sized businesses with the cost of installing electric vehicle (EV) chargepoints and associated infrastructure for staff and fleet use. It covers installation work and supporting infrastructure needed to enable multiple chargepoints. (Find a Grant)

Eligibility

Applicant types

See eligibility requirements

Industries

All sectors where SMEs have eligible staff or fleet parking requirements

Match funding

Businesses must cover eligible installation costs that are not covered by the grant contribution.

Eligible applicants

Small and medium-sized businesses with 249 employees or fewer, subject to the scheme's registration and eligibility requirements. (Find a Grant)

Funding and scope

Benefit amount

Grant covered 75% of eligible installation and infrastructure costs, up to £15,000 per grant. Support included up to £350 per chargepoint socket and up to £500 per parking space enabled by supporting infrastructure. A maximum of five grants could be received across five different sites. (Find a Grant)

Total fund available

£5 million (Find a Grant)

Funding intensity

Grant covered 75% of eligible installation and infrastructure costs, up to £15,000 per grant. Support included up to £350 per chargepoint socket and up to £500 per parking space enabled by supporting infrastructure. A maximum of five grants could be received across five different sites. (Find a Grant)

Payment type

Not specified

Eligible expenses

  • Installation and infrastructure costs associated with installing eligible EV chargepoints, including supporting electrical infrastructure.

Ineligible costs

Not specified

Application and risks

Application platform

OZEV Electric Vehicle Chargepoint Grants online portal

Competitiveness

Not scored

Decision timeline

Grant claim is made after installation. The approved installer submits the claim to OZEV for review and payment.

Assessment process

Grant claim is made after installation. The approved installer submits the claim to OZEV for review and payment.

Application sections

Not specified

Application components

  • Online application, installer details, property and parking details, company registration or VAT details and supporting information required under the scheme

Required documents

Not specified

Appendices

Not specified

Assessment criteria

  • Eligibility, correct installation setup, eligible chargepoint and infrastructure costs, and compliance with scheme requirements

Decision risks

Applications may be rejected if eligibility or technical requirements are not met. Non-compliance identified through audits may result in withdrawal or recovery of grant funding.

Timeline and partners

Opening date

1 Apr 2022

Project duration

Not specified

Project start

Not specified

Project end

Not specified

Additional guidance

Document research last revised 2026-08-14.

Intent to Apply Deadline

Not specified

Key Organisational Requirements

Applicants must be eligible SMEs and have suitable off-street parking for staff or fleet vehicles. The chargepoints must meet OZEV requirements and be installed by an approved installer. (GOV.UK)

Governance Requirements

Applicants must comply with OZEV scheme rules, applicable safety requirements and the relevant minimum technical specifications for commercial chargepoints. (GOV.UK)

Monitoring Requirements

OZEV may audit applications and supporting evidence. Installations may also be subject to compliance checks.

Doctoral Studentships

Not specified

Industry Leverage Expectation

Not specified

Environmental & EDI Requirements

Supports the transition to low-emission transport and wider UK sustainability and decarbonisation objectives.

important notes

This grant is closed. The official Find a Grant listing records a closing date of 31 March 2026. I could not find an official announcement confirming a replacement reopening date for this specific scheme. The Workplace Charging Scheme continues to provide support for eligible workplace chargepoints, but it is a separate scheme. (Find a Grant)

Application deadline in source document

Closed on 31 March 2026. The government listing records 31 March 2026 as the closing date. (Find a Grant)

Official source

Read the funding authority guidance

Quick facts

Status
Closed
Deadline
31 Mar 2026
Funding amount
Grant covered 75% of eligible installation and infrastructure costs, up to £15,000 per grant. Support included up to £350 per chargepoint socket and up to £500 per parking space enabled by supporting infrastructure. A maximum of five grants could be received across five different sites. (Find a Grant)
Funding band
Not specified
Funding type
Capital grant
Payment type
Not specified
Audience
See eligibility requirements
Industry
All sectors where SMEs have eligible staff or fleet parking requirements
Last updated
16 Oct 2026
Published
Not specified

Source links

Secondary sources

Source 1