The Workplace Charging Scheme (WCS) provides financial support to organisations for the purchase and installation of electric vehicle (EV) chargepoints at workplaces. It supports the transition to electric vehicles by expanding workplace charging facilities. (Find a Grant)

Summary

Deadline

31 Mar 2027

Updated

16 Oct 2026

The Workplace Charging Scheme (WCS) provides financial support to organisations for the purchase and installation of electric vehicle (EV) chargepoints at workplaces. It supports the transition to electric vehicles by expanding workplace charging facilities. (Find a Grant)

Eligibility

Applicant types

See eligibility requirements

Industries

All sectors with eligible workplace parking facilities

Match funding

Applicant must fund any remaining installation costs not covered by the grant

Eligible applicants

Businesses, charities, public sector organisations and small accommodation businesses

Funding and scope

Benefit amount

Covers up to 75% of eligible purchase and installation costs, including VAT, capped at £500 per socket from 1 April 2026; maximum 40 sockets across all sites per applicant. (Find a Grant)

Total fund available

Not specified

Funding intensity

Covers up to 75% of eligible purchase and installation costs, including VAT, capped at £500 per socket from 1 April 2026; maximum 40 sockets across all sites per applicant. (Find a Grant)

Payment type

Not specified

Eligible expenses

Not specified

Ineligible costs

  • Installations required by building regulations or planning conditions; previously funded installations; customer-only parking facilities

Application and risks

Application platform

Workplace Charging Scheme online application portal

Competitiveness

Not scored

Decision timeline

Voucher issued within 5 working days if the application is approved. The installer claims the grant after installation. (Find a Grant)

Assessment process

Voucher issued within 5 working days if the application is approved. The installer claims the grant after installation. (Find a Grant)

Application sections

Not specified

Application components

  • Online application form, business verification, site details, parking details and installer information

Required documents

Not specified

Appendices

Not specified

Assessment criteria

  • Eligibility compliance, suitable site and parking arrangements, use of authorised installer and eligible chargepoint, and compliance with scheme rules

Decision risks

Applications may be rejected if eligibility requirements are not met. Grants may be reclaimed where installations or claims do not comply with scheme requirements

Timeline and partners

Opening date

1 Apr 2022

Project duration

Not specified

Project start

Not specified

Project end

Not specified

Additional guidance

Document research last revised 2026-08-14.

Key Organisational Requirements

Applicant must own the site or have permission from the landowner; must have dedicated off-road parking associated with the workplace; parking must be suitable for chargepoint installation; an authorised installer and eligible chargepoint must be used. (Find a Grant)

Governance Requirements

Compliance with subsidy control rules and applicable safety and regulatory requirements

Monitoring Requirements

Installations may be audited and documentation or site access may be required

Industry Leverage Expectation

Not specified

Environmental & EDI Requirements

Supports the transition to low-emission transport and expansion of sustainable workplace charging infrastructure

Important Notes

Funding is confirmed until 31 March 2027 and the grant is currently open. From 1 April 2026, the maximum grant increased from £350 to £500 per socket. Successful applicants receive a voucher valid for 180 days, and the installer must claim the grant after installation. (Find a Grant)

Application deadline in source document

31 March 2027, 11:59pm

Official source

Read the funding authority guidance

Quick facts

Status
Verification Required
Deadline
31 Mar 2027
Funding amount
Covers up to 75% of eligible purchase and installation costs, including VAT, capped at £500 per socket from 1 April 2026; maximum 40 sockets across all sites per applicant. (Find a Grant)
Funding band
Not specified
Funding type
Capital grant
Payment type
Not specified
Audience
See eligibility requirements
Industry
All sectors with eligible workplace parking facilities